Both these bathrooms were in the same house. Both were completely redone. Walls were moved; plumbing and electrical lines were moved; all fixtures bought new and installed. ~bathroom one~ ~bathroom two~
Valley restoration on slate roof
Today we’d like to showcase a start-to-finish project of a valley restoration job that was done on a slate roof. Note: valleys replaced on both sides of this dormer, pictures of work show both sides. Before valley on this 120 year old Monson slate roof is worn out, tarred and leaking Removal: Existing slate isContinue reading Valley restoration on slate roof
Arched dormer, copper roof and some roofing comparisons
In this post we shall do a quick walk through of an arched dormer renovation process as well as include a small comparison of various roofing options for this particular project. Here is the initial condition of the dormer. Wood is rotting, and birds have made their nest. For this particular window a new arched crown moulding wasContinue reading Arched dormer, copper roof and some roofing comparisons
Custom Rails and Balusters
For this project we took down the existing balusters, posts, and columns, turned and/or built new ones, reinstalled and painted. Process: Installed (not painted) Finished in detail: Finished, overview:
Kitchen Renovation ~ Copper sink
This kitchen renovation featured an installation of a copper sink, stone work behind the stove and general interior carpentry renovations: built in cabinets and woodwork around the window. The cabinets were purchased used at an antique/salvage store and were made to fit by cutting and rebuilding.