In the interest of length, this Home on the Bay will be showcased in three separate posts. Today’s post will feature exterior work and the interior work done on the floors and windows. Front of house Work done includes Moving doors: front entry was moved to the location shown in the photo above {previously itContinue reading Home on the Bay ~ Fall 2015